Главная / At the stations of the branch \»Primorsk generation\»

At the stations of the branch \»Primorsk generation\»

At the stations of the branch "Primorsk generation" At the stations of the branch «Primorsk generation» of «Eastern generating company» continues to prepare for the autumn-winter period in 2013-2014. As part of the repair campaign for scheduled work will be stopped Partisan Power Plant. In the period from August 12 to September 5 provided the planned shutdown of Partisan power plant for repairs on a single chimney power plant. The last time the power facility is completely stopped in the summer of 2009. Repair works are of routine nature and do not provide for any limitation of consumers of electricity or thermal energy. «To date, repair campaign in the branch continues in accordance with the approved work program. On three power stations of a total of 12 have already repaired boilers and turbines 6 which is half of the annual plan repairs. At the moment there are 4 in the repair of the boiler and turbine 2. All planned work on the main and auxiliary equipment of all stations of the branch are conducted according to schedule, «- said the director of the branch» Primorsk generation «of» DGC «Dmitry Swan. He also said that a total for the heating season will repair 100% of the basic equipment of Vladivostok TPP-2 and TPP Partisan Artyomovskaya CHP. This year, for the purpose of energy will send more than 700 million rubles. The repair campaign in the branch «Primorsk generation» will be completed by early November.

Рубрики

Последние статьи

Свежие комментарии