Home / On life support village Vladivostok directed 15000000

On life support village Vladivostok directed 15000000

On life support village Vladivostok directed 15000000

About 15 million rubles were sent in 2012 from the local budget to the territorial department «village Vladivostok» to perform various tasks to ensure the life of the countryside.

Solved one of the urgent problems of residents with quality water villagers Krolevec. As a result of the execution order of the municipal capital repair of water supply systems in rural Krolevec connecting to centralized water supply system of the village factory (the replacement of pipes in 1660 linear meters) in the streets S.Rabochih, Mukhina, Jeremic in the amount of 3 million rubles, which resulted in an uninterrupted water supply and improve water quality.

In addition, refurbished and reconditioned two drinking wells in the village of Vladivostok and one — in Krolevec, at the same time, as the experts of Territorial Administration of the village, there is an urgent need for service has a number of wells, as apply for the administration Artemovsky urban district.

In 2012 was made the necessary work on the boiler «Aviation»: replaced the chimney, there are two high-efficiency boilers and boiler exhauster on st. Aviation. 800 rubles was spent to replace the transformer TP-392 village Vladivostok.

One of the vital problems of the village Vladivostok — is drainage. For many years, there was a question about the transfer of the sewage system in the municipality Artemovsky urban district. In 2011 the system was transferred to the emergency, not operational.

To produce a major reconstruction was necessary to perform the construction documents. The project involves the reconstruction of the existing networks. Vladivostok and the construction of sewage treatment plants full biological treatment capacity of 1000 cubic meters per day. The project is planned by the regional program «Clean Water» by co-financing from the regional and local budgets. The cost of construction and installation works about 70 million rubles.

At present, the local budget annually for the maintenance of the efficiency of the system (before the construction of CBS and transfer to a specialized service organization).

Оставить комментарий

Ваш адрес email не будет опубликован. Обязательные поля помечены *

Рубрики

Последние статьи

Свежие комментарии